Project management

Every sheet and clause.
Read once. Linked for good.

Drawings are registered from their title blocks, specifications are read clause by clause, and RFIs, submittals and the programme sit against them. Ask a question and the answer cites the sheet and the clause.

Consultancy AI·Larkspur House › Drawings
Drawings
Larkspur House · 473 sheets · 12 issues · last received today
Consultancy AIRead vectorsQR packsUpload
Issue 12 · Stage 4 revision · 6 files from Laird Studio · received from the transmittalreading title blocks…
NumberTitleRevDisciplineStatus
LH-LRD-ZZ-00-DR-A-2000General arrangement — Level 00P6CADArchitectureReading…Processedsupersedes P5
LH-LRD-ZZ-01-DR-A-2001General arrangement — Level 01P6CADArchitectureReading…Processedsupersedes P5
LH-LRD-ZZ-01-DR-A-2301Reflected ceiling plan — Level 01P4ArchitectureReading…Processed
LH-BME-ZZ-01-DR-M-5101Mechanical services — Level 01P3MechanicalReading…Processed
LH-BME-ZZ-01-DR-E-6101Small power and data — Level 01P3ElectricalReading…Processed
LH-LRD-ZZ-XX-DR-A-4010Section A-A through the atriumP2ArchitectureReading…Processed
6 read from the title block and the PDF text2 revisions superseded2 DWGs paired · geometry read14 section links found

An issue arriving: title blocks read, revisions superseded, the register updated.

From the issue to the answer

The record a project runs on, kept by the platform

Consultancy AI·Larkspur House › Specifications › NBS K10
Plasterboard dry linings — NBS K10ProcessedVerified
Specification · Rev P02 · 40 pages · From Laird Studio · 8 sections
Consultancy AI
DownloadOpen in new tabConnectThumbnailsSections
Plasterboard dry linings
NBS K10 — particular specification · Larkspur House · Rev P02 · Laird Studio
Search by meaning
“what fire rating do the corridor partitions need?”
610 Fire-rated systems, p.8 — 60 minutes to corridors and stair enclosures; 30 minutes elsewhere. Cross-ref 310 Partitions, p.4.
Sections · 8 main
110Intentp.1
210Plasterboardp.2
215Fixings and adhesivesp.3
310Partitionsp.4
315Bulkheads and ceiling marginsp.5
320Access panelsp.6
420Jointing and finishingp.7
610Fire-rated systemsp.8
Linked records · RFI #004 · LH-LRD-ZZ-01-DR-A-2301
01

Every clause read once, then answered by meaning

A specification is read on upload: sections detected, confirmed by you, and the text indexed. From then on the platform answers questions from it, and a query or a submittal can cite the clause.

  • Sections navigate the PDF; the viewer opens at the clause, not page one.
  • Search by meaning across every specification on the project, not by keyword.
  • Connect links the clause to the RFI, the drawing and the submittal that rely on it.
What reading a specification gives you
Consultancy AI·Larkspur House › RFIs › RFI #004
RFI #004 Responded
Reception feature ceiling — confirm omission before bulkhead is framed
Consultancy AIReviseExport PDF
Is the reply satisfactory?Close RFICreate revision
Tarn & Ashby
Unit 4, Riverside Works · Manchester
RFI #004
P26001 · Larkspur House · for Ardent Estates
Reception feature ceiling — confirm omission before bulkhead is framed
ToR. Menon (Laird Studio)
FromSam Okafor
Date raised19 Aug 2026
Due date26 Aug 2026
LocationLevel 1 reception, grid C/7
Cost code4000 · Drylining
Cost impactYes · CCI 003
Programme impactYes · on the critical path
DrawingsLH-LRD-ZZ-01-DR-A-2301 rev C
SpecificationK10/315 Bulkheads
Ball withSam Okafor
Copies toAlan Pryor, Ardent Estates
Question from Sam Okafor · 19 Aug 2026, 10:00

A-2301 rev C omits the feature ceiling at reception but the door schedule rev B still carries the ceiling-mounted closers. Please confirm the omission is instructed before the bulkhead is framed on Monday 24 August.

Reply from R. Menon, Laird Studio · 22 Aug 2026, 10:00

Confirmed — the feature ceiling is omitted under AI-023. Proceed with the plasterboard bulkhead to detail A-2104/07. The door schedule will be corrected at rev C.

02

The query is the document, not a form that prints one

Raise it from the drawing you are looking at, with the clause and the mark-up attached. It reads as the receiver will read it, on your letterhead, and the reply lands on the same page.

  • The facts beside the question: location, the drawings and the clause, cost and programme impact.
  • Ball with moves on issue, on reply and on referral; the register shows age and due date.
  • Close it, or create a revision that asks again with the reply on record. Export as a PDF.
Sending to firms outside the platform
Consultancy AI·Larkspur House › Submittals
Submittals
Larkspur House · 18 on the register · 2 awaiting the architect
Consultancy AI+ New submittal
RefTitleSpecStatusDue
SUB-014Suspended ceiling system — technical data · Halliwell DryliningK40/210Approved21 Aug
SUB-015Fire-rated partition test evidence · Halliwell DryliningK10/610Approved as noted28 Aug
SUB-016AHU-01 and AHU-02 — selection and O&M · Marlow MechanicalT60/320Revise and resubmit04 Sep
SUB-017Carpet tile samples — meeting rooms · Pennine FloorsM50/450Under review11 Sep
SUB-018Ironmongery schedule — final · Norton & BellP21/110Draft18 Sep
SUB-016 · AHU-01 and AHU-02 — selection and O&M
Revise and resubmit
Rev A · from Marlow Mechanical, 26 Aug · reviewed by R. Menon, Laird Studio, 2 Sep · spec T60/320 · programme: plant deck AHU set-down 21 Sep
Reviewer’s comment. Selection shows 4.2 m³/s against the 4.8 m³/s in T60/320 clause 3.4. Resubmit with the fan curve at the design duty and the acoustic data for the roof-level attenuators.
Rev B due 11 Sep · 10 days before set-down Programme riskExport PDF
03

Technical submissions reviewed against the clause and the date

Each submittal cites the specification clause it answers and the programme task it gates. Your comment lands on the document; a resubmission is a revision, not a new record.

  • Approved, approved as noted, revise and resubmit: the status you gave, on the register.
  • Due dates are measured against the task on the programme, so a late resubmission reads as a programme risk.
  • Every submittal exports as a document on your letterhead.
Consultancy AI·Larkspur House › Programme
Programme
Project schedule and Gantt chart • 0 tasks
Consultancy AI
+Week ▾⚠ Critical PathBaselinesExport
WBSTask NameStart%
1PHASE 1: MOBILISATION01 Sep
1.1Possession and set-up01 Sep100%
2PHASE 2: STRIP OUT08 Sep
2.1Strip-out, levels 1–308 Sep0%
3PHASE 3: PLANT DECK15 Sep
3.1Plant deck steelwork15 Sep0%
3.2AHU lifts and installation13 Oct0%
4PHASE 4: FIT-OUT29 Sep
4.1Partitions and ceilings29 Sep0%
4.2Raised access floors27 Oct0%
4.3M&E first and second fix03 Nov0%
4.4Finishes and decorations14 Dec0%
5Commissioning and handover25 Jan0%
6Practical completion01 Mar
Sep 2026
Oct
Nov
Dec
Jan 2027
Feb
W36
W40
W44
W48
W52
W4
W8
PHASE 1: MOBILISATION
Possession and set-up
PHASE 2: STRIP OUT
Strip-out
PHASE 3: PLANT DECK
Plant deck steelwork
AHU lifts and installation
PHASE 4: FIT-OUT
Partitions and ceilings
Raised access floors
M&E first and second fix
Finishes and decorations
Commissioning and handover
04

The programme, with its logic intact

Import it from Asta Powerproject, Primavera P6 or Microsoft Project, or have the agent draft one from the project brief. Either way it is a Gantt you can interrogate: revisions, a baseline, the critical path.

  • Save revisions and hold a baseline; compare them to see what has moved.
  • Ask the agent for the critical path, the slipped tasks or a what-if.
  • Edit it like any Gantt: drag, link, indent.
Bringing in the programme you have

Questions

How are drawings registered?
Upload the issue as PDF, PNG or JPG and the title block of each sheet is read: number, title, revision, discipline, scale and originator. You check what was read, correct anything that needs it, and publish to the register.
Are revisions tracked automatically?
Yes. When a new revision arrives, the platform finds the drawing with the same number and records the supersession. The previous revision is marked superseded, the new one becomes current, and the full history stays one click away.
What does reading a specification give us?
On upload a specification is read, split into its sections and indexed by meaning, not just by keyword. From then on a question about a requirement is answered from the text, with the clause cited, and RFIs and submittals can be linked to the clause they concern.
What happens to a drawing supplied as a DWG?
Attach the DWG to the sheet and its geometry is read: layers become a legend, rooms become named spaces, and measurements come from the vectors rather than from a scaled PDF. The PDF stays the picture; the DWG supplies the numbers.
Can we bring in the programme we already have?
Yes. Import from Asta Powerproject, Primavera P6 or Microsoft Project. The activities, the logic and the dates come across, and from there you can hold a baseline, save revisions and ask for the critical path.
Can we send things to firms outside the platform?
Yes. Drawings export with their mark-up as flattened PDFs. RFIs, correspondence and submittals export as documents on your letterhead, and registers export to Excel.